Guide

How to write a quote for a job (with a worked example)

How to write up a quote step by step, what it must include, a full example quote you can copy, the mistakes that lose the job, and what to do after you send it.

By Sheetsmith · 10 October 2026 · 9 min read

Most small businesses lose quotes they should have won, and not on price. They lose them because the quote arrived late, was hard to understand, or left the customer unsure what they were actually getting. A good quote is a sales document: it should make saying yes easy. This guide shows you how to write one up, step by step, with a complete example at the end.

Quote, estimate or quotation? Say which

In the UK these mean different things, and mixing them up causes arguments later.

  • A quote (or quotation, same thing) is a fixed price for a defined piece of work. Once the customer accepts it, that is the price, unless the work itself changes.
  • An estimate is your best guess. It can go up or down, and you should say roughly by how much.

Put the word at the top of the document. If parts of the job genuinely cannot be priced until you start (what is behind that wall, how many hours the data clean-up takes), quote the parts you can and give an estimate, clearly labelled, for the rest.

How to write up a quote in seven steps

  1. Write the scope first, before any numbers. List what you will do in the order you will do it. Room by room, stage by stage, or deliverable by deliverable. If you cannot describe it, you cannot price it.
  2. Write what is not included. Decorating, flooring, waste removal, parking, revisions beyond two, hosting after the first year. This line protects you more than anything else on the page.
  3. Price the labour. Hours or days multiplied by your rate, and be honest with yourself about the hours. Add the travel, the pick-ups from the merchant and the tidying, because they happen whether or not you charged for them.
  4. Price the materials. List them at the price you will pay plus your margin for sourcing, carrying and guaranteeing them. Fifteen to twenty-five per cent is normal in most trades. If the customer wants to supply their own, say that you will not warrant them.
  5. Add VAT, or say there is none. If you are VAT registered, show the net, the VAT and the total. If you are not, write "No VAT is charged" so nobody wonders whether a surprise is coming.
  6. Set the terms. Deposit, stage payments, when the balance is due, how to pay, how long the price is valid for, and when you can start.
  7. End with the next step. "To go ahead, reply to this email" or "sign and return the last page". One action, clearly stated.

What every quote should contain

PartWhy it matters
Your business name, address, phone and emailthey need to be able to find you again in three weeks
The customer's name and the job addressit shows the quote was written for them, not copied
A quote number and the dateso both of you can refer to it, and you can find it
Valid until (usually 30 days)prices move; it also gives you an honest reason to follow up
The scope, in plain wordswhat you will do, room by room or step by step
What is not includedthe single best protection against disputes
The price, broken into lineslabour, materials, extras. People trust a breakdown more than a round number
VATnet, VAT and total if registered; "No VAT is charged" if not
Payment termsdeposit, stage payments, when the balance is due, how to pay
When you can start and how long it will takeoften the deciding factor
How to accept"reply to this email" or "sign and return" - one clear action

A worked example

Here is a complete quote for a small bathroom job, laid out the way the table above describes. Swap the trade and the lines for your own; the shape is the same for a decorator, a web designer, a photographer or a bookkeeper.

QUOTE Q-2041 · 10 October 2026 · Valid until 9 November 2026

From: Hartley Plumbing & Heating, 14 Mill Lane, Leeds LS6 2AB · 07700 900123 · jo@hartleyplumbing.co.uk

To: Sam Patel, 22 Orchard Road, Leeds LS7 4QT

Job: Replace bath with walk-in shower, first-floor bathroom

What is included

  1. Strip out existing bath, panel and taps; cap off and make safe. Remove waste from site.
  2. Supply and fit 1200 × 800 low-profile shower tray and waste.
  3. Supply and fit thermostatic mixer shower and riser rail (Mira Atom or equivalent).
  4. Supply and fit 8 mm glass shower screen with chrome fittings.
  5. Adjust hot, cold and waste pipework to the new positions.
  6. Tile the shower enclosure to ceiling height in customer's chosen tile (allowance below), grout and seal.
  7. Test, clean down, and walk through the controls with you.

Not included: removal of the existing floor tiles, any electrical work (an extractor fan would need an electrician), redecoration, and remedial work to pipework or joists found once the bath is out. Anything found will be priced in writing before it is done.

LineAmount
Labour, 3 days, two people£1,320.00
Shower tray, waste and fittings£285.00
Mixer shower and riser rail£240.00
Glass screen£310.00
Tiles: allowance of £35 per m², 6 m²£210.00
Adhesive, grout, silicone, sundries£95.00
Skip share and waste disposal£80.00
Subtotal£2,540.00
VAT at 20%£508.00
Total£3,048.00

Payment: 25% deposit (£762.00) on booking to secure the date and order materials. Balance due within 7 days of completion, by bank transfer to the account on the invoice.

Timing: We can start Monday 3 November. The job takes three working days; the bathroom is out of use for two of them.

To accept: reply to this email saying "go ahead" and I will confirm the dates and send the deposit invoice. I will check in with you on Wednesday in case you have any questions.

Notice what the example does. The scope is numbered so the customer can picture the job. The exclusions are specific. The price is nine lines, not one. The tile line is an allowance, which lets Sam pick any tile without a new quote. The deposit and the start date are on the quote, not sprung later. And the last line tells Sam what to do and tells them a follow-up is coming, so the follow-up is expected rather than a nag.

Five mistakes that lose the job

1. Sending it late. The customer asked three people. The first credible quote sets the benchmark, and the third often is not read. Aim for the same day for simple jobs, and within 48 hours for anything you had to visit.

2. One big number. "Bathroom refit: £3,048" invites the question "why so much?" The same total shown as strip-out, tray, shower, screen and tiling answers it before it is asked.

3. No exclusions. "Price excludes decorating, flooring and any remedial work to existing pipework" costs you nothing and saves the conversation where the customer thought it was included.

4. Jargon. Write it so their partner, who was not at the visit, can understand it. They are usually part of the decision.

5. No next step. A quote that ends with the total leaves the customer to work out what happens now. End with how to accept and when you could start.

Options help people say yes

Where it is honest to, give two or three options rather than one price: the basic job, the job done properly, and the job with the extra they mentioned wanting. People find it easier to choose between options than to decide yes or no, and the middle option wins most of the time. Do not pad the list; each option should be something you would be happy to deliver.

Deposits and payment terms

State them on the quote, not on the invoice afterwards. A common pattern for jobs with materials is a deposit on booking that covers the materials, a stage payment for longer jobs, and the balance on completion within seven days. Whatever you choose, putting it in the quote means accepting the quote is accepting the terms.

Sending it

Send it as a PDF, not an editable document, with a two-line covering message: thank them for their time, say the quote is attached and valid for 30 days, and say when you will check in. Then actually check in. Most quotes that go quiet are not a "no": they are a busy person who meant to reply. Our guide on how to follow up a quote without being a pest has the timing and three messages you can copy.

After you send it: the part most people skip

A quote is worth nothing in your sent folder. The moment it goes, write down three things: who it went to, the value, and the date you will chase it. A quote you forget to chase is a job you did not get, and across a year that is usually more lost work than any competitor takes from you.

A diary works. A spreadsheet with a "next date" column works. A CRM that shows you the day's follow-ups when you open it works best, because it survives the week when you are too busy to look. Whatever you use, the rule is the same: no open quote without a chase date against it.

After they say yes

Confirm in writing what was accepted and the start date, take the deposit, and keep the quote with the job. When a customer asks for something extra halfway through, price it as a short written variation before you do it. It feels formal for a small job, and it is the difference between a happy final invoice and a disputed one.

Common questions

How long should a quote be valid for? Thirty days is the norm. Shorter if your material prices move quickly, longer if the customer has told you the decision is months away. Always put the date on it.

Do I need to add VAT if I am not registered? No. Say so on the quote ("No VAT is charged") so the customer knows the total is the total.

Should I charge for writing a quote? For most jobs, no; it is the cost of winning work. For large or design-heavy jobs where the quote itself takes a day, some businesses charge a fee that is deducted from the job if it goes ahead. Say so before you visit.

How many quotes should I expect to win? Trades and services commonly win between a quarter and half of what they quote. If you win nearly everything, you are probably too cheap. If you win almost nothing, the price is not usually the problem; the quote is arriving late or it is unclear.

Can I change a quote after the customer accepts it? Only if the job changes. That is what the exclusions and the written variation are for. If you simply got the price wrong, that is your cost to carry, which is why step three above says to be honest about the hours.

Is a quote legally binding? Once accepted, a quote forms the basis of the contract, so the price and scope you wrote are what you have agreed to. This is general information, not legal advice; for anything unusual, ask a solicitor or your trade body.

Build the quote in the free Quote & Invoice Generator - it prints or saves as a PDF and nothing is uploaded - then book the follow-up in Sheetsmith CRM so it chases itself.

Take a look